POWER SHUT DOWN
Panaji: April 23, 2026 A power shut down has been arranged on April 25, 2026 from 9.30 a.m to 1.00
Read MorePanaji: April 23, 2026 A power shut down has been arranged on April 25, 2026 from 9.30 a.m to 1.00
Read MorePanaji: April 23, 2026 The Executive Engineer, Works Division – VII (NH) PWD, has notified the closure of RHS side
Read Moreता. 22 एप्रिल 2026 करमळी-ता. 25 एप्रिल 2026 दिसा 11 केव्ही करमळी फिडराचेर ताकतीकेचे दुरूस्ती काम करपाचे आशिल्ल्यान सकाळी 9.00
Read More“Empowering Nari Shakti is our responsibility and the foundation of a progressive society,” says Chief Minister Dr. Pramod Sawant Panaji:
Read MorePanaji: April 22, 2026 A power shut down has been arranged on April 23, 2026 from 9.30 a.m to 1.00
Read Moreता. 22 एप्रिल 2026 मुख्यमंत्री डॉ. प्रमोद सावंत हांणी आयज खांडोळें हांगाच्या सरकारी कला, विज्ञान आनी वाणिज्य म्हाविद्यालय कॅम्पसांत नव्यान
Read Moreता. 22 एप्रिल 2026 पर्वरी-ता. 23 एप्रिल 2026 दिसा 200 केव्हीए मिलियन सुपर मार्केट फिडराचेर ताकतीकेचे दुरूस्ती काम करपाचे आशिल्ल्यान
Read Moreता. 21 एप्रिल 2026 फुडल्या मे म्हयन्या खातीर अंत्योदय अन्न येवजण रेशन कार्डधारकांक रेशन कार्डाफाटल्यान 35 किलो फोर्टिफाईड तांदुळ फुकट
Read Moreता. 21 एप्रिल 2026 पर्वरी-ता. 23 एप्रिल 2026 दिसा 11 केव्ही पर्वरी फिडराचेर ताकतीकेचे दुरूस्ती काम करपाचे आशिल्ल्यान सकाळी 9.30
Read Moreता. 27 मार्च 2026 गोंय सरकाराच्या कला आनी संस्कृती संचालनालयान “गोंयांतल्या वारकऱ्यां खातीर मजत येवजण” हे येवजणे खाला गोंयच्या वारकरी
Read More