POWER SHUT DOWN AT TIVIM SUBSTATION TO CARRY OUT PRE-MONSOON WORK
Panaji: April 24, 2026 A power shut down has been arranged on April 26, 2026 from 6.00 a.m to 12.00
Read MorePanaji: April 24, 2026 A power shut down has been arranged on April 26, 2026 from 6.00 a.m to 12.00
Read Moreता. 24 एप्रिल 2026 कला आनी संस्कृती संचालनालयान नामनेचे व्यंगचित्रकार सर्गेस्त मारियो मिरांडा हांच्या जल्म शताब्दी वर्सांच्या कार्यक्रमाचो एक भाग
Read MorePanaji: April 24, 2026 The Goa Board of Secondary and Higher Secondary Education informed that the result of SSC Public
Read MorePanaji: April 24, 2026 The installation if 11/0.433KV, 3-Phase, 50Hz, 100 KVA Distribution transformer cetre along with RMU, Circuit breaker
Read MorePanaji: April 24, 2026 A power shut down has been arranged on April 26, 2026 from 6.00 a.m to 12.00
Read Moreता. 24 एप्रिल 2026 वीज खात्यान काणकोण म्हालातल्या तांबडे आगोंद हांगा नवीन उबारिल्लें 100 केव्हीए ट्रान्सफॉर्मर केंद्र आनी जोडून आशिल्ली
Read Moreता. 24 एप्रिल 2026 पावसाळो सुरू जावपा पयलीच्या वर्सुकीं दुरूस्ती कामा खातीर ता. 26 एप्रिल 2026 दिसा 33/11 केव्हीए कांदोळी,
Read Moreता. 24 एप्रिल 2026 ता. 26 एप्रिल 2026 दिसा 11 केव्ही शिवोली, सडये फिडराचेर ताकतीकेचे दुरूस्ती काम करपाचे आशिल्ल्यान सकाळी
Read MorePanaji: April 24, 2026 A power shut down has been arranged on April 26, 2026 from 6.00 a.m to 2.00
Read Moreता. 24 एप्रिल 2026 ता. 25 एप्रिल 2026 दिसा पॅराडायज ऑन अर्थ-पर्वरी फिडराचेर ताकतीकेचे दुरूस्ती काम करपाचे आशिल्ल्यान सकाळी 9.30
Read More