वीज पुरवण खंडीत
ता. 22 एप्रिल 2021 ता. 23 एप्रिल 2021 दिसा 11 केव्ही ओल्ड गोवा फिडराचेर ताकतिकेचें दुरूस्ती काम करपाचें आशिल्ल्यान सकाळी
Read Moreता. 22 एप्रिल 2021 ता. 23 एप्रिल 2021 दिसा 11 केव्ही ओल्ड गोवा फिडराचेर ताकतिकेचें दुरूस्ती काम करपाचें आशिल्ल्यान सकाळी
Read MorePanaji, April 22, 2021 Vaisakha 2, 1943 A power shut down has been arranged on Diwar feeder from 9.30 a.m.
Read MorePanaji, April 22, 2021 Vaisakha 2, 1943 A power shut down has been arranged on 11 KV Davorlim feeder from
Read MorePanaji, April 22, 2021 Vaisakha 2, 1943 A power shut down has been arranged on 11 KV Borim feeder from
Read MorePanaji, April 21, 2021 Vaisakha 1, 1943 A power shut down has been arranged on Assonora feeder from 9.00 a.m.
Read MorePanaji, April 21, 2021 Vaisakha 1, 1943 The Government has declared April 23, 2021 as a paid holiday being the
Read MorePanaji, April 21, 2021 Vaisakha 1, 1943 The existing Zuari Bridge will be closed on May 2, 2021 from 6.00
Read MorePanaji, April 21, 2021 Vaisakha 1, 1943 A power shut down has been arranged on 11KV Nanus feeder from 9.00
Read Moreता. 21 एप्रिल 2021 ता. 22 एप्रिल 2021 दिसा 11 केव्ही अस्नोडा फिडराचेर ताकतिकेचें दुरूस्ती काम करपाचें आशिल्ल्यान सकाळी 9.00
Read Moreता. 21 एप्रिल 2021 जुवारी पुलाच्या डॅक पातळीची नोंद करपाच्या कामाखातीर ता. 2 मे 2021 दिसा सकाळी 6.00 ते 9.00
Read More