POWER SHUTDOWN

February 03, 2023

Magha 14, 1944

A power shutdown has been arranged on February 05, 2023 from 8.00 a.m. to 12.00 p.m. at Ind-III feeder Kundai Sub-station on account of urgent maintenance works. The areas affected are all Industries and factories connected to Ind-III feeder in Kundai Industrial Estate, as informed by the Department of Information and Publicity.

 DI/NB/AXP/SF/UH/2023/147

 

POWER LINE WARNING

February 03, 2023
Magha 14, 1944

The New erected HTC installation, 1 X 250 KVA, 11KV/0.433KV Transformer along with 11KV RMUs, 440V ACB panels and associated HT and LT cables at Organic Waste Management Facility, opp. LIC Building, Patto, Panaji pertaining to the Commissioner, Corporation of the City of Panaji, Panaji –Goa will be test charged on February 06, 2023 and will remain charged thereafter.

Similarly, the New erected HTC installation, 1 X 315 KVA, 11KV/0.433KV Transformer along with 11KV RMUs, 440V ACB panels and associated HT and LT cables at Organic Waste Management Facility, near Heera Petrol Pump, Patto, Panaji pertaining to the Commissioner, Corporation of the City of Panaji, Panaji –Goa will be test charged on February 06, 2023 and will remain charged thereafter.

Also the New erected HTC installation, 1 X 500 KVA, 11KV/0.433KV Transformer along with 11KV RMUs, 440V ACB panels and associated HT and LT cables at Material Recovery Facility, St. Inez, Panaji pertaining to the Commissioner, Corporation of the City of Panaji, Panaji –Goa will be test charged on February 06, 2023 and will remain charged thereafter.

Public are hereby cautioned not to come in contact with the above stated equipment as the same may be dangerous to human and animal life.

Skip to content