POWER SHUT DOWN
Panaji, January 03, 2026
There will be a power shut down to carry out maintenance work on January 05, 2026 from 9 am to 1 pm at 200 KVA Petrol Pump DTC at Harmal. Hence there will be no power in Madhlawada, Korkhankar wada and surrounding areas of Petrol Pump in village panchayat of Harmal. Similarly, on January 06, 2026, there will be a power shut down on 200 KVA Vatika DTC (HT) from 9 am to 1 pm. Areas affected are vicinity of Hotel Vatika and surrounding areas.
DI/NB/AXP/SAG/CR/CN/2026/1093

