POWER SHUT DOWN

Panaji: July 19, 2024

Ashadha 28, 1946

A Power Shut down has been arranged on July 20, 2024 from 9.00 am to 01.00 pm on 11KV Quepem, 11 KV Rivona, 11 KV Xelvona and 11 KV Assolda Feeder, to replace the existing 11 KV 185 sq.mm power cable with 11 KV 300 sq.mm power cable. Affected areas are Quepem, Rivona, Xelvona and Assolda.

DIP/NB/AXP/SS/LT/2024/366

Skip to content