CLOSURE OF OLD ZUARI BRIDGE FROM JANUARY 23 TO FEBRUARY 28
Panaji: January 18, 2024
Executive Engineer of Division XIV (NH) PWD, Fatorda Margao – Goa, in-charge of the Highway stretch of NH-66 has ordered closure of existing Old Zuari bridge for designated traffic from January 23, 2024 till February 28, 2024 to enable the Assistant Engineer, SD-I, WDXIV (NH), PWD, Cortalim to carry out the bridge repair works and also direct the diversion of all traffic through the respective RHS & LHS Corridors of the adjacent New Zuari Bridge.
DI/NB/AXP/SS/SP/2024/2231