POWER SHUT DOWN
Panaji, April 29, 2021
Vaisakha 9, 1943
A power shut down has been arranged on 11 KV Borim feeder from 9.30 a.m. to 2.00 a.m. on April 30, 2021 on account of tree cutting and oil greasing of AB switch. The areas affected are Ganganagar, Pandagal-1, Pandgal-2, Ayurvedic, Tirumala, Vazem Haldai, Vazem Dock, Savergal Karai Moll, Karai Zariwada, Karai Bagh, Kari Church, BSNL, Bhati RIT.
Similarly, a power shut down has been arranged on 11 KV Dharbandora feeder from 9.30 a.m. to 3.00 a.m. on April 30, 2021 to replace old conductor with new under R&I work, affecting Shivdem Margewadi.
Similarly, a power shut down has been arranged on 11 KV Dharbandora feeder from 9.30 a.m. to 4.00 a.m. on May 1, 2021 to replace old conductor with new under R&I work, affecting Gudsai.
Further, a power shut down has been arranged on 11KV Dharbandora feeder from 9.30 a.m. to 3.00 a.m. on May 3, 2021 to replace old conductor with new under R&I work, affecting Panshi, as informed by the Department of Information and Publicity.
DI/NB/AXP/RM/GD/2021/95