Home »News


 

POWER SHUT DOWN

Panaji, January 16, 2021

                                                  Pausa 26, 1942

 

A power shutdown has been arranged on 11 KV Ashvem Cable feeder on January 18, 2021 between 8.30 a.m. to 2.00 p.m. The areas affected are New Wada Morjim, Ashvem and surrounding areas.

 

A power shutdown has been arranged on Collem Bhat Mollem feeder on January 19, 2021 between 9.00 a.m. to 2.00 p.m. in order to carry out tree cutting work and maintenance. The areas affected are Azrakar, Bagatmol, Bankattem, Bazarwada, Bharipwada, Bimbol, Bodumol, Cansaulim, Condemol, Coronzol, Dairy Farm, Devgali, Father Farm, Fornento, G.N. Agarwal, Gawaliwada, Hospital DP, HTC 10, HTC 78, Kajurnol, Khutirnol, Makadaya (Proposed), Mandovi, Matojem, Metwada, Mollem Bazar, N. Sawant, Navawada, P.T.I. Palaskatta, Piklewadi, Pimpolmol, Proposed HTC, R. Kanekar, Salgaonkar, Salgaonkar, DP, Shigao H/C, Shinde Farm, Sonavalim, Souzamol, Suktolim, Takwada, Tambdimol, Tarchimol, V P Mollem, Vakikulan, Velipwada, Vikaswada, Voldem, Zambaulim.

 

A power shutdown has been arranged on 11 KV Siolim feeder on January 20, 2021 between 8.30 a.m. to 2.00 p.m. The areas affected are Cruz Wado, Ingrez Wado, Siolim Church, Aframet Vaddy in V.P. Marna Siolim and surrounding areas.


A power shutdown has been arranged on 11 KV Morjim feeder on January 23, 2021 between 8.30 a.m. to 2.00 p.m. The areas affected are V.P. Morjim, Ashvem and surrounding areas, as informed by Department of Information and Publicity.


DI/NB/AXP/JS/GD/2021/924

 

TOP